- Incoming control of working documentation, checking for completeness and compliance with project regulatory documentation;
- Control over adherence to the work schedule;
- Incoming control of materials and equipment used, verification of quality documents;
- Checking the compliance of completed works with project solutions and current technical regulation requirements;
- Participation in the inspection of hidden works, intermediate acceptance of constructed structures affecting the safety of the capital construction object, sections of engineering and technical support networks;
- Operational control over the compliance with the sequence and composition of performed technological operations;
- Acceptance of completed works according to KS-2 acts, checking the compliance of the actual work performed with the presented and confirmed executive documentation;
- Control over the timely and correct maintenance of executive documentation, checking for completeness and compliance with the requirements of working and regulatory documentation;
- Geodetic and laboratory control;
- Control of compliance with labor protection and industrial safety rules;
Verification, together with the contractor, of the compliance of the completed construction object with the requirements of the design and the working documentation prepared based on it, the results of engineering surveys, the requirements of the urban planning plan of the land plot, and technical regulations.